Utgrunden 16.9.2000. Photo: Gunnar.Britse
Enron Wind will install 7 x 1,5 MW windmills
I will follow the installationprocess and publish photos and informations here,

The first tower and nacelle at Utgrunden being installed
More photos will be presented in a shorttime.
Photo: 27.09.00 Copyright: Gunnar Britse.

Utgrunden 7.10.2000. Photo: Gunnar.Britse
The first rotor installed,.


232. The monopile/photo Eric

233. Photo Eric

234. Hammering./Photo Eric


235. The hammer

236. On the way out.

237. The Tyl.


238. The Zodiac.

239. Neptun 6

240 The Wind.


241. Fransisco.

242. The Crane.

243. Planning


244. Bergkvara harbor

245. Study visit

246. Engine room.


247. 7 radareco

248. Mobile crane

249. Neptun 6


250. Cranedriver

251. Sailor

252. Embarking.


253. Maintenance

254.The first.

255. The second

256. 12 m/s
257. Bergkvara harbour

258. Dayshift out.


259. Dayshift

260. Captain Dinks

261.


262. Lifting the first

263.

264. The Wind bridge


265.

266. The Nacelle

267


268.

269. The "Container"

270.

271

272. The Nacelle

273. Martin


274. Charlotte

275. Digital photos

276. Captain Gwan.

277. Loading for no 2

278. Welding

279. Nacelle no 6

280. The "Wind" brigde

281. The Zodiac

282. The Zodiac

283. 5 of 7

284. Loading the rotor

285.

286.

287. For Utgrunden

288. Before The lift

289.

290.

291. The first.

292.

293.

294. Sea rescue

295 The second

296 Loading cable

297 Cable conveyor

298. ABB Karlsrona

299
I will publish more photos
later on.
Gunnar Britse

301.Project chief

302.

303. Crane driver

304. Utgrunden offshore

305.The Wind bridge

306. Nacelle

307.

308. From the basket

309. View




Bockstigen okt 1997